Total Valuation
|
Fee
|
| Up to and including $1,000.00 |
$35.00 |
| $1,001.00 to $25,000.00 |
$35.00 for the first $1,000.00 plus $11.00 for each additional $1,000.00 or fraction thereof, up to and including $25,000.00 |
| $25,001.00 to $50,000.00 |
$299.00 for the first $25,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, up to and including $50,000.00 |
| $50,001.00 to $100,000.00 |
$474.00 for the first $50,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof, up to and including $100,000.00 |
| $100,001.00 and up |
$724.00 for the first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof |
|
Demolition Permit:
|
$100.00 or $25.00 for buildings under 400 SF and without utility services. |
|
House Moving Permit:
|
$300.00 or $25.00 for buildings under 400 SF and without utility services. $150.00 or $25.00 for moves within Fargo's extraterritorial area. |
|
Board of Appeals:
|
$150.00 filing fee. |
|
Plan Review: Projects for which a site plan review is required. |
Twenty (20) percent of the attributable building permit fee. |
Other inspections and fees:
|
|
1. Inspections outside of normal business hours (minimum charge: two hours)
|
$60.00 per hour*
|
|
2. Reinspection fees assessed under Sections 108 and 109 of the International Building Code
|
$60.00 per hour*
|
|
3. Inspections for which no fee is specifically indicated (minimum charge: one half hour)
|
$60.00 per hour*
|
|
4. Additional plan review required by changes, additions, or revisions to plans (minimum charge: one half hour)
|
$60.00 per hour*
|
|
5. For use of outside consultants for plan checking, inspections, or both.
|
Actual Cost**
|
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
** Actual costs include administrative and overhead cost.